API Service: Integrate Bill Payment API's
VTU Service: Buy Affordable Airtime/Data
Epin Service: Print Recharge Card with Ease
  • 4 Min Read
  • 37 Views

Abuja (Aedc) Prepaid Meter Prices 2025: How Much Will You Pay?

Navigating electricity costs and billing systems in Nigeria, particularly under the Abuja Electricity Distribution Company (AEDC), can sometimes feel like a maze. Many customers have struggled with estimated billing, unexpected high charges, and lack of transparency. Thankfully, prepaid meters offer a solution, allowing you to pay for electricity before usage and better control your consumption.

If you’re looking to get a prepaid meter in Abuja under AEDC, this guide provides the latest 2025 prices, application steps, and answers to frequently asked questions.

What Are Prepaid Meters and Why Should You Get One?

Prepaid meters are digital electricity meters that require users to pay for electricity before consuming it. The system is similar to how you recharge airtime on a phone—once your electricity credit runs out, you need to top up to continue using power.

Why Switch to a Prepaid Meter?

  1. No More Estimated Billing – You only pay for what you use, avoiding inflated electricity bills.

  2. Better Budgeting – Monitor your usage and control how much you spend on electricity.

  3. Convenience – Recharge your meter anytime using mobile apps, banks, or designated vendors.

  4. Fairer System – No hidden charges, no monthly bills, just direct payment for the power you consume.

AEDC Prepaid Meter Prices for 2025

As of 2025, AEDC has updated its prepaid meter prices based on the Meter Asset Provider (MAP) program, which allows private vendors to supply and install meters. Prices vary depending on the type of meter (single-phase or three-phase) and the vendor.

Latest AEDC Prepaid Meter Prices (VAT Inclusive)

Single-Phase Meters (For Homes & Small Businesses)

MAP Vendor

Price (₦)

BTS Power Limited

131,027.26

Chintech Electro Nigeria Limited

130,075.00

Chris Ejik International Agencies Ltd

139,300.06

Mojec Asset Management Ltd

135,987.50

Turbo Energy Ltd

145,608.75

Hampoc Utilities Ltd

139,750.00

Masters Energy Metering Company Ltd

145,125.00

Three-Phase Meters (For Large Homes & Businesses)

MAP Vendor

Price (₦)

BTS Power Limited

218,981.00

Chintech Electro Nigeria Limited

231,125.00

Mojec Asset Management Ltd

226,825.00

Turbo Energy Ltd

236,903.13

Hampoc Utilities Ltd

236,500.00

Masters Energy Metering Company Ltd

258,000.00

Important Notes

  • Prices include VAT and may be subject to future changes.

  • Meter prices may vary slightly among vendors due to supply and logistics costs.

  • For the most accurate pricing, visit AEDC’s official website (abujaelectricity.com) or contact their customer support.

How to Apply for a Prepaid Meter Under AEDC

Getting a prepaid meter in Abuja is straightforward, whether you're a new or existing customer.

For New Customers (First-Time Electricity Connection)
  1. Get the Application Form – Download the Application for Electricity Supply and Agreement Form (Form 74)from AEDC’s website or collect it from your nearest AEDC office.

  2. Submit Your Form – Fill out the form and submit it to the AEDC office in your area.

  3. Site Verification – AEDC will inspect your property to determine the right meter type (single-phase or three-phase).

  4. Receive Your Contract Number – If approved, AEDC will assign you a contract number.

  5. Payment Notification – You will receive details of the required payment.

  6. Make Payment – Pay using the provided reference code through AEDC’s official payment channels.

  7. Meter Installation – AEDC will schedule and complete the installation after payment is confirmed.

For Existing Customers (Switching from Estimated Billing)
  1. Online Registration – Visit AEDC’s website, select ‘Getting Metered’, then click on ‘MAP’ and choose ‘Existing Customer’ to fill out the online form.

  2. Site Verification – AEDC will inspect your property to confirm the right meter type.

  3. Receive Payment Notification – AEDC will send details of the payment process.

  4. Make Payment – Pay for the meter using your reference code.

  5. Meter Installation – AEDC will install the meter within 10–15 working days after payment.

FAQs: Abuja (AEDC) Prepaid Meters

Q1: Why Should I Get a Prepaid Meter?

A: A prepaid meter helps you control your electricity usage, avoid estimated billing, and only pay for the power you use.

Q2: How Long Does It Take to Get a Meter Installed?

A: Once you make payment, AEDC typically installs the meter within 10–15 working days, but the timeline may vary.

Q3: Are There Any Additional Charges?

A: The prices listed include VAT, but you may need to cover installation logistics, which can vary depending on location.

Q4: Where Can I Pay for My Prepaid Meter?

A: Payments can be made through AEDC’s official website, bank transfers, or AEDC designated payment centers.

Q5: How Do I Recharge My Prepaid Meter?

A: You can recharge via mobile banking, AEDC online platforms, local vendors, or bank payment points.

Q6: Can I Install the Meter Myself?

A: No. AEDC’s authorized technicians must install the meter to ensure proper setup and compliance.

Q7: What Happens If I Run Out of Credit?

A: Your electricity will be disconnected automatically until you purchase and load more credit.

Final Thoughts

Switching to a prepaid meter under AEDC is one of the best decisions you can make if you want transparent, fair, and efficient electricity billing. With the updated 2025 prices, you now have a clearer idea of how much you’ll pay based on the meter type and vendor.

If you’re tired of estimated billing and high electricity costs, applying for a prepaid meter should be a priority. Simply follow the application steps, choose a trusted MAP vendor, and enjoy better control over your electricity consumption.

For the latest updates on prepaid meters, visit abujaelectricity.com or contact AEDC customer support for assistance.

 



0 Comments

Get Paid for Your Opinion!

Leave a comment below and earn ₦2 per comment.

Your email address will not be published.

Login or Sign up to post a comment